摘要:為研究淺埋偏壓斷層公路隧道洞口段變形觀測(cè)方法及變形規(guī)律,采用全站儀對(duì)邊測(cè)量及高差測(cè)量的方法,對(duì)雅溪沖隧道進(jìn)口地表沉降、圍巖收斂及拱頂下沉進(jìn)行變形監(jiān)測(cè),得出如下結(jié)論:①淺埋偏壓斷層公路隧道洞口段圍巖變形分為急劇變形、緩慢變形及基本穩(wěn)定三個(gè)階段;②周邊位移、拱頂下沉及地表下沉變形趨勢(shì)同步;③圍巖穩(wěn)定性,可通過(guò)變形速率、變形-時(shí)間曲線的變化趨勢(shì)來(lái)綜合判定;④采用環(huán)形開(kāi)挖預(yù)留核心土施工的隧道,可采用全站儀進(jìn)行觀測(cè)。
Abstract: In order to research on the method of deformation monitoring and deformation law of tunnel portal section of fault tunnel of highway shallow buried bias pressure, the means of total-station instrument for opposite side measurement and elevation difference measurement was utilized. After monitoring the ground settlement, convergence of surrounding rocks and dome sinking of the Yaxichong tunnel, I got the conclusions drawn as follows: First, the surrounding rock deformation of tunnel portal section of fault highway tunnel of shallow buried bias pressure was divided into three stages: dramatical deformation, slow deformation and basic stability. Second, there was a synchronic trend of peripheral displacement, dome sinking and surface submerging and deformation. Third, the stability of surrounding rocks could be judged comprehensively by the tendency of deformation rate and deformation-time curve. Fourth, I found that it was accessible to observe tunnels conducted by construction with circular excavation and core soil reservation by total-station.
關(guān)鍵詞:高速公路;隧道監(jiān)控量測(cè);淺埋偏壓;洞口;變形規(guī)律
Key words: highway;tunnel monitoring and measurement;shallow buried bias pressure;tunnel portal;law of deformation
中圖分類號(hào):U452.1+1? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 文獻(xiàn)標(biāo)識(shí)碼:A? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? 文章編號(hào):1006-4311(2019)25-0179-02
0? 引言
公路隧道監(jiān)控量測(cè)是新奧法施工的重要一環(huán),其監(jiān)測(cè)數(shù)據(jù)為設(shè)計(jì)變更提供依據(jù)[1-3]。監(jiān)控量測(cè)項(xiàng)目分為選測(cè)項(xiàng)目和必測(cè)項(xiàng)目?jī)煞N。其中,必測(cè)項(xiàng)目包括洞內(nèi)外觀察、地表下沉、拱頂下沉及周邊位移四種[4-8]。隧道埋深較淺則圍巖自穩(wěn)能力差,地形不對(duì)稱則隧道支護(hù)結(jié)構(gòu)受力不對(duì)稱而形成偏壓,斷層則隧道圍巖較破碎,穩(wěn)定性差。因此,對(duì)公路淺埋偏壓斷層隧道洞口段變形監(jiān)測(cè)方法及變形規(guī)律的研究具有重要的科研價(jià)值和現(xiàn)實(shí)意義。
1? 工程概況
1.1 工程簡(jiǎn)介
G209、G319吉首繞城公路一期工程,起于起于乾州二炮臺(tái),經(jīng)水廠路,止于林木山,與S229相接,全長(zhǎng)19.316公里。雅溪沖隧道全長(zhǎng)2645m,中線最大埋深173m,屬二級(jí)公路長(zhǎng)隧道,洞身凈寬12m。
1.2 工程地質(zhì)條件
雅溪沖隧道地處低山丘陵工程地質(zhì)區(qū),隧道進(jìn)口端位于南向山坡,坡角約34°,山勢(shì)較陡,隧道軸線與等高線右交角約43°,洞口軸線與地形的關(guān)系屬坡面斜切入型,橫向地形變化較大,前進(jìn)方向右側(cè)偏壓較大。隧道進(jìn)口端發(fā)育一斷層F,斷層F與路線相交于K8+246附近,斷層規(guī)模較小,發(fā)育于向斜南端,走向長(zhǎng)小于300m,走向318°,傾向48°,傾角20~25°,破碎帶寬度0.2~0.5m,斷層下盤為寒武系上統(tǒng)西陽(yáng)山組灰?guī)r,上盤為奧陶系下統(tǒng)灰?guī)r夾泥質(zhì)灰?guī)r。
K8+220~K8+255洞口淺埋段,最大埋深為10m,圍巖為寒武系上統(tǒng)西陽(yáng)山組灰?guī)r,夾薄層泥質(zhì)灰?guī)r,較堅(jiān)硬,節(jié)理裂隙發(fā)育,巖體較破碎,碎塊狀結(jié)構(gòu),地表溶蝕發(fā)育,薄層薄層第四系殘坡積土,圍巖自穩(wěn)性較差,V級(jí)圍巖。
1.3 水文地質(zhì)條件
雅溪沖隧道所在區(qū)域?qū)賮啛釒駶?rùn)氣候,四季分明,降雨充沛,年平均降雨量1391.7mm。地表水為季節(jié)性水流,受降水影響明顯,對(duì)隧道建設(shè)影響較小。地下水主要有松散堆積層孔隙水、基巖裂隙-巖溶水。
1.4 施工及加固方法
淺埋偏壓段洞口設(shè)置偏壓擋墻并結(jié)合超前管棚進(jìn)行預(yù)加固,同時(shí)采用鋼筋混凝土襯砌結(jié)構(gòu)形式確保隧道結(jié)構(gòu)穩(wěn)定、安全,施工時(shí)盡快完成仰拱施作,與拱墻及早形成封閉承載體系,避免因施工工藝不當(dāng)導(dǎo)致地面下沉、開(kāi)裂和二襯產(chǎn)生裂縫。地表采用注漿加固,洞口端邊、仰坡采用早強(qiáng)藥卷錨桿掛網(wǎng)噴射混凝土支護(hù),加固土體,減少地表及邊仰坡變形。
洞口段V級(jí)圍巖采用環(huán)形開(kāi)挖預(yù)留核心土法開(kāi)挖,按拱頂、左拱腰、右拱腰順序環(huán)形開(kāi)挖上斷面,施作初期支護(hù),然后開(kāi)挖上端面核心土,下端面左、右側(cè)跳槽開(kāi)挖,并施作相應(yīng)初期支護(hù)。
2? 變形監(jiān)測(cè)方案設(shè)計(jì)
2.1 變形控制標(biāo)準(zhǔn)
2.2 觀測(cè)頻次要求
2.3 測(cè)點(diǎn)布設(shè)
2.4 觀測(cè)方法
由于洞口段V級(jí)圍巖采用環(huán)形開(kāi)挖預(yù)留核心土法開(kāi)挖,作業(yè)面狹小,傳統(tǒng)監(jiān)測(cè)方式收斂計(jì)及水準(zhǔn)測(cè)量已不適應(yīng)周邊位移及拱頂下沉監(jiān)測(cè),故采用全站儀對(duì)邊測(cè)量及高差測(cè)量的方式配合反射片進(jìn)行周邊位移及拱頂下沉監(jiān)測(cè)。地表沉降采用水準(zhǔn)測(cè)量進(jìn)行觀測(cè)。
2.5 觀測(cè)結(jié)果分析
采集數(shù)據(jù)后及時(shí)繪制周邊位移、拱頂下沉、地表下沉-時(shí)間曲線圖,如圖1。從K8+230監(jiān)測(cè)數(shù)據(jù)來(lái)看,淺埋偏壓斷層公路隧道洞口段圍巖變形分為急劇變形、緩慢變形及基本穩(wěn)定三個(gè)階段。隧道開(kāi)挖后10天內(nèi)(6.17-6.26)變形速率>1mm/d,為急劇變形狀態(tài),變形量呈線性增長(zhǎng);開(kāi)挖后11~30天(6.27-7.16)變形速率1.0~0.2mm/d,為緩慢變形狀態(tài);開(kāi)挖30天后圍巖變形速率<0.2mm/d,處于基本穩(wěn)定。周邊位移、拱頂下沉及地表下沉變形趨勢(shì)同步,累計(jì)變形量<25mm,其中,周邊位移累計(jì)最大變形值為20.6mm(水平測(cè)線C線),為收斂變形,拱頂下沉累計(jì)沉降量為22.17mm,地表下沉累計(jì)沉降量為23.47mm。
3? 結(jié)語(yǔ)
本文通過(guò)對(duì)雅溪沖隧道淺埋偏壓洞口段監(jiān)測(cè)數(shù)據(jù)的分析,得出以下結(jié)論:
①淺埋偏壓斷層公路隧道洞口段圍巖變形分為急劇變形、緩慢變形及基本穩(wěn)定三個(gè)階段。隧道開(kāi)挖后10天內(nèi)變形速率>1mm/d,為急劇變形狀態(tài),變形量呈線性增長(zhǎng);開(kāi)挖后11~30天變形速率1.0~0.2mm/d,為緩慢變形狀態(tài);開(kāi)挖30天后圍巖變形速率<0.2mm/d,處于基本穩(wěn)定。
②周邊位移、拱頂下沉及地表下沉變形趨勢(shì)同步,累計(jì)變形量<25mm。
③淺埋偏壓斷層公路隧道洞口段圍巖穩(wěn)定性,可通過(guò)變形速率、變形-時(shí)間曲線的變化趨勢(shì)來(lái)綜合判定。當(dāng)處于急劇變形時(shí)應(yīng)增加觀測(cè)頻率,必要時(shí)調(diào)整支護(hù)設(shè)計(jì),采取加固措施。
④采用環(huán)形開(kāi)挖預(yù)留核心土施工的隧道,其周邊位移及拱頂下沉可采用全站儀對(duì)邊測(cè)量及高差測(cè)量的方式進(jìn)行觀測(cè)。
參考文獻(xiàn):
[1]張勇.隧道施工監(jiān)控量測(cè)技術(shù)發(fā)展現(xiàn)狀及思考[J].工程技術(shù)應(yīng)用,2019,6:64-65.
[2]林常青.隧道施工監(jiān)測(cè)信息化研究[J].價(jià)值工程,2018,23:272-273.
[3]周建芳.六盤山隧道監(jiān)控量測(cè)方案研究[J].價(jià)值工程,2014,18:127-129.
[4]贠永峰,唐格.隧道圍巖收斂變形監(jiān)測(cè)及穩(wěn)定性研究[J].中外公路, 2015, 35(3):210-213.
[5]付志鵬,閆濤,汪樹峰,周子榮,王浩林.隧道圍巖收斂變形動(dòng)態(tài)監(jiān)測(cè)分析[J].浙江建筑,2019,36(1):34-36.
[6]王智超,徐偉,張學(xué)兵,沈明燕,曠杜敏.淺埋偏壓隧道變形特征及施工方案優(yōu)化.湘潭大學(xué)自然科學(xué)學(xué)報(bào),2017,39(3):34-41.
[7]張勃蓬.高速公路新奧法隧道圍巖變形特性現(xiàn)場(chǎng)測(cè)試分析[J].黑龍江交通科技,2018,295(9):157-158.
[8]干嘯洪,陳立平,張素磊,應(yīng)國(guó)剛,李小平.淺埋偏壓隧道地表沉降規(guī)律及其預(yù)測(cè)方法[J].現(xiàn)代隧道技術(shù),2019,56(2):78-84.