      Analysis on Variation and Workload Confirmation Transmission System Optimization Cases

      2017-12-26 00:05:48李成寶黃俊
      環(huán)球市場信息導(dǎo)報 2017年33期
      關(guān)鍵詞:李成青島石油

      ◎李成寶 黃俊

      Analysis on Variation and Workload Confirmation Transmission System Optimization Cases

      ◎李成寶 黃俊

      A large foreign project, one of the world's largest LNG plant construction projects, 36 core process modules in construction with a total weight of 200,000 tons approximately, project duration started from July 2014 and will be completed in July 2017. The variation and workload confirmation transmission management system is established and implemented with exploration and innovation in this project, the author elaborated variation and workload confirmation transmission system by extraction of optimized cases in order to provide a practical reference for variation and workload confirmation management work in oil and gas module construction projects.

      Preface

      Due to the particularity of variation and workload confirmation work in this large foreign project, the author perform classification management to the variation and workload confirmation transmission system which is divided into discipline engineering and mechanical and electrical installation engineering according to bidding and contract awarding mode.

      Variation and workload confirmation transmission system optimization case analysis

      Variation confirmation transmission optimization case

      Current transmission path: 1 variation submitted by subcontractors (with paper variation account)-2 PMT discipline engineers review and sign-3 PMT document control engineers sort-4 subcontractors document control engineers register, receive, sign, distribute, and transfer to PMT after its leader’s signature-5 PMT document control engineers register, receive, sign, distribute to module managers for signature and transfer to design department-6 design department document control engineers register, receive, sign, distribute and transfer to PMT after its leader’s signature -7 PMT document control engineers register, receive, sign and distribute to PMT discipline engineers-8 PMT discipline engineers review and signleaders approve

      Optimized transmission path: 4 subcontractors document control engineers register, receive, sign, distribute and transfer to design department after its leader’s signature-5 design department document control engineers register, receive, sign, distribute and transfer to PMT after its leader’s signature-6 PMT document control engineers register, receive, sign and distribute to PMT discipline engineers-7 PMT discipline engineers submitted to module managers for signature, then PMT discipline engineers review and submitted to leaders for approval

      Workload confirmation transmission optimization case

      At the early period of this project, PMT designate department A responsible for subcontracting management of mechanical and electrical installation engineering and small structure bulk materials division and transmission. During the process of implementation, it was discovered that column internals, electric heat tracing were unable to be divided by discipline. Afterward it was determined that functional management department A responsible for electric heating and PMT construction department A responsible for column internals. Due to subcontracting contracts signing and site actual situation, special workload confirmation sheet increasingly but document control engineers cannot confirm transmission direction according to documents. Afterward it was determined that PMT discipline engineers to make special mark on account, this method can effectively avoid the probability of error, mistake, omit and others in the process of transmission. After optimization, it was concluded that functional management department A responsible for discipline engineering subcontracting management, electric heat tracing and special workload transmission and signing work. PMT construction department A responsible for subcontracting management of mechanical and electrical installation project, bulk materials, column internals transmission and signing work in order to ensure each discipline workload confirmation transmission in good order and synchronously with variation confirmation transmission.

      Conclusion

      After years of development, domestic project management theory has basically formed a unique project management system and project management personnel have adequate knowledge about project management knowledge system. The author devotes himself into the practice, innovation and implementation of variation and workload confirmation transmission management system, and this paper extracted two optimized cases to perform analysis in order to provide a reference only for variation and workload confirmation and management work in oil and gas module construction projects.

      (作者單位:海洋石油工程(青島)有限公司)

      猜你喜歡
      李成青島石油
      懷念李成章教授
      石油石化展會
      奇妙的石油
      上合,從青島再啟航
      金橋(2018年7期)2018-09-25 02:28:14
      青島如何引進(jìn)人才
      商周刊(2018年10期)2018-06-06 03:04:10
      延長石油:奮力追趕超越 再鑄百年輝煌
      青島明月申牌?
      莊玉庭先負(fù)李成蹊
      棋藝(2016年4期)2016-09-20 05:38:45
      行吟黔境
      海底的石油是怎樣形成的
      兴化市| 天门市| 渑池县| 乌兰察布市| 桐梓县| 华池县| 赞皇县| 柘城县| 泰和县| 富锦市| 酒泉市| 逊克县| 沈丘县| 达拉特旗| 大名县| 永仁县| 溆浦县| 凤凰县| 拜泉县| 新津县| 林芝县| 宁晋县| 长宁区| 象州县| 定兴县| 乌拉特后旗| 新丰县| 三都| 桃园市| 竹北市| 郑州市| 雅江县| 江门市| 普格县| 西平县| 紫金县| 巴里| 竹溪县| 宜君县| 安宁市| 铜梁县|