摘 要:實(shí)施工程修繕改造是提升水利設(shè)施效能的重大舉措。寶雞峽工程局2015年春季承建工程共25項(xiàng),整個(gè)施工從寶雞渠首至咸陽涇陽跨距近200km,面廣線長(zhǎng),地形復(fù)雜,施工難度較大。本文結(jié)合實(shí)際,分析了寶雞峽工程局春季項(xiàng)目建設(shè)實(shí)施眾多創(chuàng)新與管理措施、取得的效果和主要經(jīng)驗(yàn),希望可以為同類工程建設(shè)提供有益借鑒。
關(guān)鍵詞:寶雞峽;節(jié)水改造項(xiàng)目;管理措施
中圖分類號(hào):S274 文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):1003-5168(2018)20-0092-02
Analysis on the Construction Management of Water Saving
Renovation Project of Baojixia Engineering Bureau
LI Ting
(Shaanxi Baojixia Engineering Bureau,Baoji Shaanxi 721001)
Abstract: It is an important measure to improve the efficiency of water conservancy facilities to carry out the renovation. The Baojixia engineering bureau built a total of 25 projects in the spring of 2015. The whole construction from Baoji canal head to Xianyang Jingyang span is close to 200km, the wide line was long, the ground type was complex, and the construction was difficult. Based on the actual situation, this paper analyzed the innovation and management measures, the results and the main experience of the spring project construction of Baojixia engineering bureau, and provided useful reference for similar project construction.
Keywords: Baojixia;water conservation rehabilitation projects;management measures
1 項(xiàng)目概況
寶雞峽工程局2015年春季承建了灌區(qū),包括2014年度節(jié)水改造、2013年度節(jié)水房建、2012年度節(jié)水調(diào)整項(xiàng)目、林家村渠首沖沙閘、王家崖水庫(kù)除險(xiǎn)加固、2013年及2014年農(nóng)業(yè)水價(jià)綜合改革項(xiàng)目等共計(jì)25項(xiàng),分布在西起林家村渠首、東至涇陽縣境內(nèi),涉及寶雞市區(qū)、眉縣、扶風(fēng)縣、武功縣、乾縣、興平市及禮泉縣,塬上塬下2條干渠和13條支渠、退水渠,面廣線長(zhǎng),地形復(fù)雜,施工難度較大。共需完成干渠改造襯砌6.424km,支渠改造35.546km,退水渠改造2條,砼34 178m3,維修改造建筑物224座,房建334.95m2,渠道防護(hù)29.831km。
2 加強(qiáng)施工管理創(chuàng)優(yōu)措施
2.1 提早準(zhǔn)備,精心組織
2015年1月,工程局就邀請(qǐng)省水利廳質(zhì)監(jiān)站專家授課,舉辦了工程質(zhì)量安全管理培訓(xùn)班,培訓(xùn)項(xiàng)目經(jīng)理、技術(shù)負(fù)責(zé)及施工負(fù)責(zé)人90余名,多方提升施工管理技能,增強(qiáng)全員質(zhì)量意識(shí);4月初,認(rèn)真?zhèn)鬟_(dá)管理局項(xiàng)目建設(shè)動(dòng)員會(huì)精神,統(tǒng)一思想,制定了《工程局2015年春季項(xiàng)目建設(shè)安排意見》,優(yōu)化配置全局人力、物力資源,落實(shí)25個(gè)項(xiàng)目部人員組成和主要責(zé)任人,詳實(shí)劃分各項(xiàng)目施工任務(wù)目標(biāo);做好項(xiàng)目實(shí)施保障,提前研制加工模具60多套,赴外省考察聯(lián)系定制優(yōu)質(zhì)土工布、水泥等主材,遴選了15家能力強(qiáng)、有實(shí)力、口碑好的優(yōu)秀施工隊(duì),全力保障項(xiàng)目高效實(shí)施。局主要領(lǐng)導(dǎo)抓全盤,班子其他成員分片包抓,一線督戰(zhàn),各負(fù)其責(zé),確保施工質(zhì)量和進(jìn)度。對(duì)每個(gè)項(xiàng)目都制定周密的施工計(jì)劃,倒排節(jié)點(diǎn)工期,扎實(shí)組織實(shí)施,針對(duì)施工中土模整修、砼配合比、入倉(cāng)、振搗、伸縮縫處理等關(guān)鍵環(huán)節(jié),嚴(yán)格按照規(guī)范操作,做到原漿收面,土模整修嚴(yán)格報(bào)驗(yàn),務(wù)求質(zhì)量?jī)?yōu)良[1]。
2.2 嚴(yán)格實(shí)施,力保優(yōu)質(zhì)
3月底,工程局各項(xiàng)目人員全部進(jìn)場(chǎng),展開各項(xiàng)前期工作。4月9日,工程局在咸陽召開緊急會(huì)議,對(duì)項(xiàng)目施工再動(dòng)員再部署。全體參戰(zhàn)人員迅速行動(dòng),各司其職,協(xié)力推進(jìn),抓緊進(jìn)行排水、清淤、挖土、修整邊坡、拆除砼板等。從4月10日起,各項(xiàng)目陸續(xù)展開渠道砼澆筑,質(zhì)檢人員嚴(yán)格把關(guān),對(duì)原材料、半成品、砼配合比進(jìn)行嚴(yán)格檢查,特別是針對(duì)施工中土模整修、砼配合比、入倉(cāng)、振搗、原漿收面及伸縮縫處理等關(guān)鍵環(huán)節(jié),項(xiàng)目部技術(shù)員、質(zhì)檢員嚴(yán)格規(guī)范施工,每道工序必須檢驗(yàn)過關(guān)才能進(jìn)入下一道工序。重點(diǎn)對(duì)施工進(jìn)度和質(zhì)量影響較大的單元工程,緊抓關(guān)鍵線路、關(guān)鍵工序施工,在土方開挖、土模修整施工中實(shí)行程序化、規(guī)范化、標(biāo)準(zhǔn)化管理,即每10m土模修整按照標(biāo)準(zhǔn)斷面打樁釘橛,并提出土模未驗(yàn)收斷面標(biāo)高標(biāo)識(shí)不能拆除以及砼未澆筑10m渠底中樁不能拆的措施,有效提高了土模的整修質(zhì)量。所有底板坡板均采用滑模施工、密實(shí)振搗,土模平整度和砼質(zhì)量力求最好。各項(xiàng)目部嚴(yán)格執(zhí)行“三檢制”,就原材料進(jìn)場(chǎng)、土方回填、土工布鋪設(shè)、襯砌模具使用、養(yǎng)護(hù)、渠堤培土每道工序都嚴(yán)格按照規(guī)范施工。有條件的項(xiàng)目部均采用商砼進(jìn)行澆筑,把橋梁、建筑物修建等讓專業(yè)工隊(duì)集中施工,有效確保了施工質(zhì)量和進(jìn)度。
2.3 克難攻堅(jiān),搶趕工期
工程局從思想、人力、物力安排上全力以赴抓項(xiàng)目建設(shè),調(diào)整內(nèi)部機(jī)構(gòu)和人員,對(duì)全局所有技術(shù)、施工人員按照項(xiàng)目節(jié)點(diǎn)統(tǒng)一優(yōu)化配置;項(xiàng)目開工前,對(duì)每個(gè)參建工隊(duì)優(yōu)中選優(yōu),并詳細(xì)列出施工所需器具、材料等清單,提出施工明確標(biāo)準(zhǔn)要求;各項(xiàng)目部人員提早進(jìn)入工地,組織排水、清淤、伐樹、新土回填、重新開渠、修整邊坡、拆除砼板,為砼開盤和確保質(zhì)量爭(zhēng)取時(shí)間。為確??偢汕缛招兴l(fā)電和灌溉抗旱不受影響,工程局全體領(lǐng)導(dǎo)干部下到一線蹲點(diǎn),促進(jìn)度,抓質(zhì)量,全局上下放棄公休節(jié)假,全面細(xì)化任務(wù),確保節(jié)點(diǎn)工期按進(jìn)度進(jìn)行。各項(xiàng)目在施工中,將任務(wù)細(xì)化到日,克服雨天多、外協(xié)難等困難,多開工作面晝夜作業(yè),加班加點(diǎn)完成節(jié)點(diǎn)任務(wù),整體施工進(jìn)度進(jìn)展快速。
2.4 狠抓安全,警鐘長(zhǎng)鳴
通過召開會(huì)議宣講、張貼標(biāo)語、懸掛橫幅宣傳、現(xiàn)場(chǎng)談話警示等方式,全面加強(qiáng)施工隊(duì)伍安全生產(chǎn)意識(shí);各工地都設(shè)立專職安全員,就人員安全防護(hù)、施工用電、混凝土拌和、運(yùn)輸、裝卸施工等制定明確制度;各種施工機(jī)械嚴(yán)格按照規(guī)范操作,加強(qiáng)現(xiàn)場(chǎng)檢查,防微杜漸,防止了各種不安全事故發(fā)生。
2.5 加強(qiáng)監(jiān)管,評(píng)比促進(jìn)
工程局班子成員實(shí)行分片包抓,下到一線,各司其職,采取分類指導(dǎo)、推進(jìn)方式抓項(xiàng)目施工。同時(shí),由工程處牽頭對(duì)各項(xiàng)目進(jìn)行階段檢查評(píng)比,多次在工地現(xiàn)場(chǎng)召開動(dòng)員會(huì)和促進(jìn)會(huì),評(píng)比促進(jìn),獎(jiǎng)優(yōu)罰劣。全局投入100余萬元,根據(jù)項(xiàng)目各渠道斷面設(shè)計(jì)大小,統(tǒng)一制作加工各類干支渠模具63套,并多次組織研究、改進(jìn),在渠道上反復(fù)試驗(yàn),確保節(jié)水項(xiàng)目施工質(zhì)量達(dá)標(biāo)合規(guī)。特別是針對(duì)施工中土模整修、砼配合比、入倉(cāng)、振搗、原漿收面、伸縮縫處理等關(guān)鍵環(huán)節(jié),組織技術(shù)員、質(zhì)檢員嚴(yán)格把關(guān),每道工序必須檢驗(yàn)過關(guān)才能簽字認(rèn)可,堅(jiān)決杜絕忽視質(zhì)量安全的行為發(fā)生。
5月中旬和下旬,工程局領(lǐng)導(dǎo)、各處室負(fù)責(zé)人組成檢查組,對(duì)各項(xiàng)目施工質(zhì)量、施工安全、成本控制管理、施工進(jìn)度、文明工地建設(shè)五方面內(nèi)容先后進(jìn)行了2次全面檢查考評(píng)。對(duì)檢查中發(fā)現(xiàn)的問題現(xiàn)場(chǎng)指出,限期督促整改,提升了工程整體質(zhì)量。
3 實(shí)際效果
2015年6月4日,工程局春季項(xiàng)目建設(shè)全線告捷。整個(gè)施工從寶雞渠首至涇陽縣跨距近200km,日上勞最高達(dá)3 000人,完成渠道襯砌45 479m,維修改造建筑物219座,房建693.64m2,渠道防護(hù)27.22km,共完成產(chǎn)值6 430萬元。至此,工程局承建項(xiàng)目最多、完成產(chǎn)值最大、工程質(zhì)量最好和施工進(jìn)度快的春季項(xiàng)目建設(shè)大會(huì)戰(zhàn)取得了全面勝利,工程進(jìn)度和質(zhì)量創(chuàng)歷史新高,為多年來工程局春季完成任務(wù)最多、質(zhì)量最好、產(chǎn)值最高的一年。所有項(xiàng)目均比原計(jì)劃工期提前完成,實(shí)現(xiàn)了兩季任務(wù)一季完目標(biāo)。
4 結(jié)語
經(jīng)過多方努力,寶雞峽工程局2015年春季項(xiàng)目建設(shè)取得了顯著的成績(jī)。結(jié)合施工實(shí)踐管理經(jīng)驗(yàn)總結(jié),工作人員主要有以下體會(huì):①提早準(zhǔn)備、精心組織,是搞好工程項(xiàng)目建設(shè)的重要基礎(chǔ);②嚴(yán)格管理、力保優(yōu)質(zhì),是搞好工程建設(shè)的中心環(huán)節(jié);③因地制宜、搶趕節(jié)點(diǎn),是保證項(xiàng)目工期的重要手段;④加強(qiáng)監(jiān)管、評(píng)比促進(jìn),是實(shí)現(xiàn)工程優(yōu)質(zhì)高效完成的根本保障。這些經(jīng)驗(yàn)和措施為灌區(qū)今后工程修繕改造提供了有益借鑒,值得進(jìn)一步推廣。